News
NCC will be exhibiting at AISTech 2008 – The Iron & Steel Technology Conference and Exposition in
Pittsburgh, PA Convention Center, May 5 – 8. Visit us at Booth No.
1131.
September 2007
Westinghouse
Successfully Implements New Motorized Work Bridge for Support
Pin Replacement (Rapid
Release article).
March 2007
480 Ton Intake Gantry Crane at Bonneville Dam nears readiness for operation after 12,600 engineering hours by NCC. The 2 million pound crane has 4 trolleys, a hammerhead crane and a total of 8 hoists. Advanced Automation Technologies in Exton, PA placed the order with NCC.
January 2007
NCC expands on an 18 year relationship with Westinghouse Electric for support of the worldwide Nuclear Service Industry.
October 2006
NCC contracted with Babcock & Wilcox, Alliance, OH to provide engineering support and project management for modifications to the Clean Environment Development Facility to operate an Oxy-Combustion test project.
June 2006
NCC contracted to design a Pinch Roll Side Guide for Special Metals. Voest-Alpine placed the order with NCC.
April 2006
NCC partners with Siemag PKM for packaging systems. NCC will provide engineering and manufacturing support for packaging equipment, including conveying, strapping, stacking and weighing.
September 2005
NCC contracted by Winkle Industries to design an 18,000 pound Slab Lifter and Roller Table supplied to the Allegheny-Ludlum, Washington, PA facility.
|